New Service Line Application


New or Existing Structure:
Structure Type:
Applicant Name:
Service Address:
Address Line 2:
Service City:
Service State:
Service Zip:
School District:
Township:
Billing Address:
Address Line 2:
Billing City:
Billing State:
Billing Zip:
Primary Phone Number:
Secondary Phone Number (optional):
Valid Email Address:
Maximum Simultaneous Gas Load Calculator

Please use the following calculator to estimate your usage based number of appliances.

*Note: BTUH values are only suggested, you may change them if needed.


ApplianceQuantityBTUHSubtotal
Furnace 0
Water Heater 0
Tankless Water Heater 0
Range 0
Dryer 0
Pool Heater 0
Generator 0
Other 0

Total BTUH:0

Total Estimated BTUH (From Above):

Please fill out the following questions to the best of your ability.
Square Footage of Structure:
Estimated Max. Hourly Load (BTUH):
Estimated Annual Commercial or Industrial Load (BTUY):
Estimated Future Max Hourly Load (BTUH):
Estimated Future Annual Commercial or Industrial Load (BTUY):
Requested/Needed Pressure:

You must call 1-800-331-7396, ext. 5, for a meter set when ready (fuel line installed and at least 1 gas burning appliance installed). Choose below the desired meter location. Please also provide distance from nearest corner of building. It is important inform us of all underground items including septic systems and tanks, phone and electric wires, drain tile, irrigation and water lines, etc., that would be in the area of the proposed service line. Area should be free of all obstructions (e.g., building materials, trailers, and excess dirt) and grading should be complete!! Leveling and seeding of trench from property line to meter location is the responsibility of the applicant.

Please Select Preferred Meter Location:
Additional Meter Location Details (e.g. distance from corner of structure, measurements):

If requested pressure exceeds 7 inches of water column, attach appliance specifications. Delivery pressure will not be increased to accommodate inadequate fuel line size. Failure to provide accurate proposed and future loads may result in significant costs to the customer. OGC is not responsible for the design and operation of the customer’s heating system including, but not limited to, insulation and plant.

Important Notes


• The fuel line must extend 10 inches from the face of the structure.
• The service riser will be installed 15 inches to the left of the fuel line entrance -or- the fuel line entrance must be installed 15 inches to the right of the service riser.
• The fuel line entrance must be installed 0 to 15 inches above the service riser.

Meters and regulators are prohibited:
1. Under stairways
2. Within 3 horizontal feet and 15 vertical feet of windows, intakes, vents, electric meters, electric entrances, electric equipment, sources of ignition, etc.
3. From being encumbered by landscaping, decking, etc.

• Sleeves are required on all masonry fuel line entrances. Sleeves shall be a non-metal material and be sealed with a waterproof sealant.
• Before OGC installs a service riser, the applicant must clearly identify final grade.
• Because no structures may be placed on top of or within the influence of OGC facilities, failure to account for proposed and future building changes may result in significant costs to the customer.
• The applicant is responsible for locating and marking all applicant-owned underground facilities. OGC is not responsible for repairing or replacing unmarked or mismarked underground facilities damaged during construction.
• Prior to meter installation and turn-on, credit information and/or a security deposit may be required.
• When ready for meter installation and turn on, call 800-331-7396. At least one gas appliance must be connected and properly installed.
• Per PUCO requirements, OGC will schedule meter installations and turn-ons within three business days of notification.

The applicant certifies that all fuel lines have been installed per International Fuel Gas Code, National Fuel Gas Code and OGC policies and specifications. If OGC personnel discover anything to the contrary, the meter will not be installed until such time that all contraventions have been successfully addressed.